A2 DEADLINES

A2 DEADLINES

Research and Planning/Hand in Folder: November 4th

Finished Music Video: January 11th

Finished Website/CD Cover/Evaluation/Blog:13th January

Monday 22 November 2010

Filming Planning for 24/11/10

On this date we plan to film at our final location - a park located in Nottingham city centre. The cast we need at this location are:
-Harriet
-Emma
-Becca (Hollie cannot make this date so we will use a different dancer)
-Ryan
-Cara (to film)

We are filming for as long as it takes and plan to capture our scene of dancing outside using the dance we choreographed in the performance studio. In addition to this we need to film the banana fight scene which will be filmed with the masks on that the dancers are wearing.
The cast we need for this scene are:
-Harriet
-Emma

The scene will be filmed in crazy costumes as was in the performance studio and masks from drama.

We will need to film the whole dance from a long shot, mid shot and both side shots as well as a range of close ups from the front, left and right.

From filming last time we learnt that the dance routine needs to be spot on otherwise it looks shoddy. All dancers need to be using full energy and on time. As well as this, we learnt that we need to take our time when filming and careful frame every shot.

For the banana fight we have planned a series of shots starting with Harriet taking a banana to the face.

Cara.

No comments:

Post a Comment